| DATA |
|
LOCK
WALL REPAIR DURABILITY PROGRAM (REMR)
|
||
| The specimens were fabricated at WES, and initial ultrasonic velocity measurements were made just prior to installation. | ||
| In November 1982, ten concrete shear blocks were installed to evaluate durability and performance of various combinations of methods and materials for bonding new concrete to existing concrete in repair of deteriorated lock walls. | ||