REMR logo space
REMR Videos
bar

Engineer Research and Development Center
Geotechnical and Structures Laboratory
space

Availability

REMR technology videos are available through the Inter-Library Loan Service. A local librarian can request copies of the videos by contacting the U.S. Army Engineer Research and Development Center Research Library (e-mail). These tapes may be copied and used for private viewing, classroom instruction, or presentations.

REMR VIDEO-CS-l
"Remedial Waterstop Installation at Pine Flat Dam," Dec. 1986, 13 min., l/2-in. (See The REMR Bulletin, Vol. 2, No. 3.)

REMR VIDEO-CS-2
"Precast Concrete Stay-in-Place Forming System for Lock Wall Rehabilitation," Jul. 1988, 20 min, l/2- and 3/4-in. (See Technical Report REMR-CS-14.)

REMR VIDEO-CS-3
"Antiwashout Admixtures for Use in Underwater Concrete Placement," Mar. 1989, 15 min.-20 sec., 1/2-in. (See Technical Report REMR-CS-19 and Technical Note CS-MR-7.2.)

REMR VIDEO-CS-4
"Comparison of Cast-in-Place Concrete Versus Precast Concrete Stay-in-Place Forming Systems for Lock Wall Rehabilitati0n--Troy Lock and Dam," Feb. 1993, 20 min.

REMR VIDEO-CS-5
"Underwater Installation of Geomembrane Systems on Concrete Hydraulic Structures," Jan. 1997, 9 min.

REMR VIDEO-EM-l
"REMR I Summary of Electrical and Mechanical Problem Area"

REMR VIDEO-GT-l
"Computer Monitoring of Foundation Grouting," Jun. 1986, 10 min., 1/2- and 3/4-in.

REMR VIDEO-HY-l
"Excessive Scour Downstream of High Level Emergency Spillways," Oct. 1987, 20 min., 1/2- and 3/4-in. (See Technical Note HY-FC-1.l.)

REMR-VIDEO-PM-l
"Overview of the Repair, Evaluation, Maintenance, and Rehabilitation (REMR) Research Program," Apr. 1985, 17-1/2 min., 3/4-in. (See Technical Report Unnumbered CS-83.)


Return to REMR Homepage. Updated: Nov 2001
Questions