|
 |
Availability
REMR technology videos are available through the Inter-Library Loan
Service. A local librarian can request copies of the videos by contacting the
U.S. Army Engineer Research and Development Center
Research Library (e-mail). These tapes may be copied and used for private viewing, classroom
instruction, or presentations.
REMR VIDEO-CS-l "Remedial Waterstop Installation at Pine
Flat Dam," Dec. 1986, 13 min., l/2-in. (See The REMR Bulletin, Vol.
2, No. 3.)
REMR VIDEO-CS-2 "Precast Concrete Stay-in-Place
Forming System for Lock Wall Rehabilitation," Jul. 1988, 20 min, l/2- and
3/4-in. (See Technical Report REMR-CS-14.)
REMR VIDEO-CS-3 "Antiwashout Admixtures for Use in
Underwater Concrete Placement," Mar. 1989, 15 min.-20 sec., 1/2-in. (See
Technical Report REMR-CS-19 and Technical Note CS-MR-7.2.)
REMR VIDEO-CS-4 "Comparison of Cast-in-Place
Concrete Versus Precast Concrete Stay-in-Place Forming Systems for Lock Wall
Rehabilitati0n--Troy Lock and Dam," Feb. 1993, 20 min.
REMR VIDEO-CS-5
"Underwater Installation of Geomembrane Systems on Concrete Hydraulic
Structures," Jan. 1997, 9 min.
REMR VIDEO-EM-l
"REMR I Summary of Electrical and Mechanical Problem Area"
REMR VIDEO-GT-l "Computer Monitoring of Foundation
Grouting," Jun. 1986, 10 min., 1/2- and 3/4-in.
REMR VIDEO-HY-l
"Excessive Scour Downstream of High Level Emergency Spillways,"
Oct. 1987, 20 min., 1/2- and 3/4-in. (See Technical Note HY-FC-1.l.)
REMR-VIDEO-PM-l
"Overview of the Repair, Evaluation, Maintenance, and Rehabilitation
(REMR) Research Program," Apr. 1985, 17-1/2 min., 3/4-in. (See Technical
Report Unnumbered CS-83.)
|